Polyurethane floor coating — Poly Paint H

Primed two-coat polyurethane floor coating with optional non-slip aggregate

Polyurethane floor coating — Poly Paint H

CONDITIONS

Start with the site

Primed two-coat polyurethane floor coating with optional non-slip aggregate · Concrete · Industrial | interior | traffic

Aggregate is a generic material; it is not an MCT product in this system.

MCT / STAGES

System stages

See each stage in context, understand its technical role and open the relevant MCT product data directly.

APPLICATION SEQUENCE

Select a stage. Follow its role to the product and technical data.

Substrate preparation

  1. Clean/dry; new concrete minimum 28 days

    System material reference; prepare the substrate as described above.

    Poly Paint HTDS ↗
  2. Apply Epo Prime

  3. Apply Poly Paint H base coat

  4. Broadcast generic aggregate where required

  5. Apply top coat after 24 h

MCT / PRODUCT ROLES

MCT products in this system

MCT / TDS

Technical data

TDS / CURRENT

MC-Poly Paint H

Revision 2.0 ·

TDS / CURRENT

MC-Epo Prime

Revision 2.0 ·

PROJECT / NEXT STEP

Bring us the condition on site.

Share the project stage, substrate, problem and site condition. If you used Solution Finder, your technical summary comes with you.

Ask an Engineer