MCT ENGINEERED SYSTEM

Old-to-new concrete epoxy bonding

Epoxy bond coat before placing fresh concrete onto prepared existing concrete

Old-to-new concrete epoxy bonding

CONDITIONS

Start with the site

Epoxy bond coat before placing fresh concrete onto prepared existing concrete · Concrete · Repair | strengthening interface

Confirm structural design requirements separately.

MCT / STAGES

System stages

See each stage in context, understand its technical role and open the relevant MCT product data directly.

APPLICATION SEQUENCE

Select a stage. Follow its role to the product and technical data.

Substrate preparation

  1. Sound/clean/dry; remove contamination and standing water

    System material reference; prepare the substrate as described above.

    Epo BondTDS ↗
  2. Apply by brush or spray

    Old-to-new concrete epoxy bonding
  3. Allow 15–30 minutes until tacky

  4. Cast fresh concrete within stated open time

MCT / PRODUCT ROLES

MCT products in this system

MCT / TDS

Technical data

TDS / CURRENT

MC-Epo Bond

Revision 2.0 ·

PROJECT / NEXT STEP

Bring us the condition on site.

Share the project stage, substrate, problem and site condition. If you used Solution Finder, your technical summary comes with you.

Ask an Engineer